Governance and policy
Rules, remits, and accountability
Governance scenario
A BSC modification conflicts with a simultaneous DCUSA modification. Cross-code coordination is needed. RECCO must facilitate resolution amongst competing governance bodies.
This is a fictionalised teaching scenario grounded in real institutional roles, published reforms, and current public-source context.
Work through the decision path below. Each choice changes the route, the institutional trade-offs, and the metrics the scenario tracks.
Step 1 of 2
A BSC modification proposes a change to settlement metering principles. Simultaneously, a DCUSA modification proposes related metering requirements. The two changes are technically compatible but have conflicting commercial implications. If both pass, suppliers face contradictory obligations. RECCO (Regulatory Coordination Committee) must be asked to facilitate.
What is at stake
How do you coordinate the modifications?
Regulatory Context
BSC Code Modification Procedure and DCUSA
Governance relationship map
Operating loop breadcrumb
Current focus: Rules and accountability
Legend
Governance and policy
Rules, remits, and accountability
Planning and investment
Connections, queue progression, and delivery planning
System operations
Real-time balancing and network operation
Market and consumer outcomes
Prices, settlement, reliability, affordability
Evidence and learning
Telemetry, assurance, and continuous improvement
Dispatch
Real-time instructions to increase or reduce generation or demand so supply stays in balance.
Balancing
The continuous process of matching electricity supply to demand while maintaining system frequency.
Constraint
A technical limit in the network that restricts how power can flow under current conditions.
Industry code
A formal rulebook that defines obligations and processes for specific market and network activities.
Connection agreement
The formal agreement setting technical and milestone conditions for connecting a project to the network.
Settlement
The process that turns metered and contractual positions into final market cashflow outcomes.
Conformance gate
A quality checkpoint that verifies whether data or implementation meets agreed standards.
LTDS
Long Term Development Statement publication requirements for distribution network data.
Guided tour
Step 1 of 8
Start with governance: policy direction, regulatory oversight, licences, and code obligations.
Why it matters: Newcomers should first understand where authority sits before interpreting operational decisions.
Open Ofgem licence and code guidancePreparing system graph…
Use this map to keep scenario decisions anchored to policy, coordination, operational delivery, and evidence feedback relationships.
Sources and methodology
Scenarios are designed as regulator-safe teaching runs. Institutional roles, programme context, and cited reform pathways stay grounded in current public sources, while event details and numbers inside the run remain fictionalised unless explicitly evidenced elsewhere. This scenario is framed against BSC Code Modification Procedure and DCUSA.