Electricity
Validate LTDS CIM data before you rely on it
Load the official Stage 1.3 EQ rules or your own SHACL file, validate LTDS artefacts against the GB profile, and inspect the schema when you need to trace a failure back to the rule set rather than guess.
Use LTDS basics first when you need the regulatory timeline, artefact pack, or the wider reason the GB LTDS profile exists.
Validate LTDS Data
Upload SHACL constraints and CIM data, or use the built-in Stage 1.3 EQ pack. Data is processed securely and never stored.
Format:
Auto-detect