Electricity

Validate LTDS CIM data before you rely on it

Load the official Stage 1.3 EQ rules or your own SHACL file, validate LTDS artefacts against the GB profile, and inspect the schema when you need to trace a failure back to the rule set rather than guess.

Use LTDS basics first when you need the regulatory timeline, artefact pack, or the wider reason the GB LTDS profile exists.

Validate LTDS Data

Upload SHACL constraints and CIM data, or use the built-in Stage 1.3 EQ pack. Data is processed securely and never stored.

Format:
Auto-detect
Ransford's Notes

About this workspace

Use the validator as a pre-flight check before you move LTDS packs into downstream modelling, submissions, or governance review. The explainer route covers why the profile exists. This route helps you test whether an artefact actually conforms.

Public validation is useful for fast triage, not final assurance. Treat the report as an early warning layer alongside BSI artefacts, operator publication notes, and your own model governance.