Workspace

London Kickoff Walkthrough

Walk through the London Grid Distribution Preliminary and Phase A kickoff, covering principles, stakeholders, and vision in the context of a real distribution network operator.

Phase A, Architecture VisionDerived from TOGAF

Kickoff artefact readiness board: six artefacts checked against four gates

Each row is a kickoff artefact and each column a readiness gate. A row clears for kickoff only when every gate passes; one blocked gate holds the whole row.

The board makes readiness explicit. A row that passes every gate is ready. A row with any block is held, so kickoff slips only on a named gap rather than a vague sense that something is unfinished.

Kickoff artefact readiness board: six artefacts checked against four gates A readiness board with six artefact rows and four gate columns, plus a status column on the right. The gates are Drafted, Sourced, Reviewed and Signed, beside a Kickoff artefact label column on the left. Each cell is a rounded tile: a green tick reading Pass, or a red cross reading Stop. Architecture Vision and the Stakeholder map pass every gate and read Ready. The Principles register and the Statement of Work pass until Signed and read Held. The Scope statement is blocked at Reviewed and Signed, and the Risk and waiver log is blocked from Sourced onward. A green and red legend names the two states, and a red note states the gate rule: every gate must pass and one block holds the row. Kickoff artefact Drafted Sourced Reviewed Signed Status Architecture Vision Pass Pass Pass Pass Ready Principles register Pass Pass Pass Stop Held Stakeholder map Pass Pass Pass Pass Ready Scope statement Pass Pass Stop Stop Held Risk and waiver log Pass Stop Stop Stop Held Statement of Work Pass Pass Pass Stop Held Gate passesGate blocked Every gate must pass before kickoff.One blocked gate holds the whole row, so a held artefact names the gap and its owner rather than slipping thedate on a hunch.