Model the data layers of a utility asset register, from GIS through SCADA to the planning layer, so data gaps between operational and planning systems are visible.
Phase C, Information Systems ArchitectureDerived from TOGAF
Asset and network data: each domain mapped from store of record to model to consumer
Four data domains each trace the same path: the system of record that holds them, the model or standard they must conform to, and the operational consumers that read them back.
Asset and network data has to land in a model the network operator already uses, such as the IEC CIM and GIS topology. Naming the model per domain gives every consumer a contract it can trust.